Interior of a working industrial hall with overhead cranes and production equipment
Kutaisi desk · plant records

Last winter’s work orders already named the bearings.

Schedulerflowcore sits with maintenance planners in Georgia and turns shift logs, vibration notes, and oil reports into a visual briefing: which machines are drifting, which spares will not arrive in time, and which stop should be brought forward.

Request a plant briefing

A week beside the line

We do not install sensors or rewrite the control room. We read what the plant already keeps, walk the assets with the people who hear them, and leave a briefing the night shift can pin beside the board.

Monday

The cabinet of paper and files

Work orders from the last two seasons, handwritten overtime notes, and any oil-lab sheets that survived the drawer. We index them against the asset list you actually use, not the one in a forgotten folder.

Wednesday

Walk with the shift

A slow circuit with the person who knows which gearbox hums after lunch. We mark heat, leaks, and access that the drawings never mention, then match those marks to the repair history.

Friday

The wall chart

Failure intervals drawn as a timeline, not a slogan. Red bands where spare lead times overlap the next likely stop. A one-page order of work for the next planned outage.

Engineer in a plant aisle reviewing equipment while holding notes
Flagship engagement

Predictive maintenance review

A three-to-five-week reading of one production line or asset group: work orders, vibration notes, and oil sheets turned into a visual briefing and an order of work for the next planned stop.

  • Span: Three to five weeks
  • Where: Your plant in Georgia, with drawing and writing at the Kutaisi desk
  • Fee basis: Quoted from asset count and the state of the records
Read the full scope

Other work we take beside that review

These sit naturally around a line that already has records, even messy ones. They are not renamed versions of the same visit.

Close view of industrial gears and machine cogs

Failure-history reconstruction

When the work-order drawer is a heap, we rebuild a readable history of stops and repeats for a chosen machine group before anyone argues about the next outage date.

How this engagement runs
Technician standing beside production equipment on a factory floor

Condition-reading interpretation

Oil-lab sheets and vibration route comments laid beside each other and beside the repair history, so a ‘watch’ on a bearing is no longer a lonely number on a page.

How this engagement runs
Industrial pipework and valves in a plant utility corridor

Shutdown-window planning

The next planned stop sequenced against spare lead times, access, and the failures that the records say will not wait politely until the date already printed on the calendar.

How this engagement runs
“They asked for the overtime book from the millwrights, which our last visitor never touched. The chart of the filler gearbox made the December stop look obvious. I still wished they had stayed for the actual outage; the briefing stopped at the plan.”
Luka M., packaging maintenance lead, food plant west of Kutaisi — after a predictive maintenance review

More plant stories

From the ninth floor on Tamar Mepe Street

The desk is in Kutaisi because that is where the plants we grew up around still send their people for parts and for arguments about shutdown dates. Briefings are written here; the walking happens on your floor.

Meet the people who walk the line

Notes from recent briefings

Short pieces on work-order files, oil sheets, and the awkward arithmetic of spare lead times.

Concrete industrial structure with repeating columns

Mean time between failures on a mixed-age line

An average interval looks calm on a slide and hides the machine that fails every time a certain grade runs. Mixed-age lines make the average almost rude. The timeline is slower to draw and harder to argue with.

Continue reading
Electrical transmission structures against a pale sky

Three-day stop, six-week coupling

Spare lead times do not respect the holiday window operations already promised to a customer. Drawing the wait across the outage hours is unkind to the calendar and kinder than finding the empty cage at dawn.

Continue reading