Shutdown-window planning

The next planned stop sequenced against spare lead times, access, and the failures that the records say will not wait politely until the date already printed on the calendar.

Industrial pipework and valves in a plant utility corridor

A date on a wall calendar is not a plan. This engagement is for plants that already know they will stop — a holiday window, a grid constraint, a customer shutdown — and need the hours inside that window ordered against what the records and the stores cage will actually allow.

Who it is for

A planner who has been given seventy-two hours and a list longer than seventy-two hours, or a stores lead who has been told “order everything” with six-week bearings and a three-day stop.

What we prepare

A sequenced order of work for the agreed window, with jobs that cannot fit marked as deferred and named. A list of spares whose lead times already miss the window, so the argument happens before the stop, not at 2 a.m. A simple visual of parallel jobs that share a crane, a permit, or the same millwright.

What we do not promise

We do not run the outage. We do not add hours to the window. If the records show a machine that will not last until the printed date, we say so; moving the date is your decision with operations.

How the sessions run

We need the intended stop dates, the stores list with promised arrival dates, and a failure history — yours, or one we already rebuilt. Two to four half-day sessions is usual. The written order of work arrives within a week of the last session.